Abstract

This article examines the design and implementation of the Expanded Public Works Programme, drawing from the lessons of the Gundo Lashu programme on labour-intensive construction in the road sector. The aim of the study was to examine major barriers to the design and implementation of the programme. The article is based on the analysis of data that were gathered from the Gundo Lashu programme. The data were collected using a structured questionnaire, face-to-face interviews with the project participants as well as reviewing key secondary data from the project documents. The study found that the projects under the Gundo Lashu programme have clearly demonstrated the importance of labour-intensive approaches, especially in the road sector. However, these projects were constrained by a wide range of challenges, ranging from a lack of community participation to poor product quality and inadequate planning for sustainable financing.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.