Abstract

Abstract This paper presents the design of a smart meter (SM) with demand response (DR) capabilities. The SM design is tested in a simulation that implements an advanced measurement infrastructure (AMI), which allows a bidirectional communication between the household smart meters and the distribution management system (DMS). The DMS deploys an energy management system (EMS) that runs a simple demand response program (DRP) based on time of use (TOU), consisting in peak and off-peak rates. Results from the simulation and the data collected from the SM show significant improvements in energy consumption during peak hours thanks to the load curtailment strategies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.