Abstract

The 100-MeV proton linear accelerator (linac) for the Proton Engineering Frontier Project (PEFP) has been developed and will be installed at the Gyeong-ju site. For the linac, a total of 11 sets of RF systems are required, and the waveguide layout was fixed to install high-power RF (HPRF) systems. One of the important interfaces with the building construction is the high-power radio-frequency (HPRF) transmission line embedded in the tunnel, which is used to transmit 1-MW RF power to each cavity in the tunnel. The waveguide section penetrating into the linac tunnel was designed with a bending structure for radiation shielding, and the dependence of its voltage standing-wave ratio (VSWR) on the chamfer length of the bending was calculated. The HPRF transmission line was fabricated into a piece of waveguide to prevent moisture and any foreign debris inside the 2.5-m thick concrete block. Air leakage was checked with a pressure of 0.25 psig of nitrogen gas, and a maximum VSWR of 1.196 was obtained by measuring the vector reflection coefficients with the quarter-wave transmission section. In this paper, the design and the fabrication of the HPRF transmission line into the PEFP linac tunnel are presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.