Abstract

The purpose of this research article is to provide a novel algorithm for the Relational Chain Sampling Inspection in order to emphasize quality products from the production sources. It is evident t...

Highlights

  • In Industries, to control quality of the finished or partly finished product, several types of acceptance sampling plans are being developed by researchers. Dodge (1955) has introduced the ChSP-1 plans for small sampling and costly situations

  • A novel relational chain sampling plans is being developed by relating the results of current lot with that of number of previous lots

  • In an industry if the production is in steady state process, correlation between the lots with reference to number of non-conformities is negligible and independence exists between the lots (Schilling, 1982)

Read more

Summary

PUBLIC INTEREST STATEMENT

Acceptance Sampling Plans control and improve the quality of the finished or partly finished products at strategic points of production process. The purpose of this research article is to provide a novel algorithm for a modern production process in order to control quality of the products before shipping from the production sources. The new sampling plan algorithm emphasizes on zero defective with chaining rule in the production process and it gives better shouldering effect on the Operating Characteristics curve. On the improvement of Chain Sampling Plans, the new sampling plans known to be Relational Chain Sampling Plans is being developed and is termed as RChSP(0, i). The efficiency measures of relational sampling plans are derived and the parameters are determined using designing procedure. Tables are constructed to facilitate quality control practitioners for practical application in industries

Introduction
11. Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call