Abstract
The design, production and erection of the steel roof structure of the City Stadium in Cetinje, Montenegro are presented. The roof structure is supported by reinforced concrete pillars and beams. Two mirror-like constructions covering the west and east grandstands were made. One roof structure consists of 16 radially placed arch girders. Roof girders are designed as double cantilever lattice girders. The main lattice girders were made from Circular Hollow Section (CHS). The design of the structure was done by the Civil Engineering Institute, Podgorica, Montenegro, while the construction, production and erection of the structure were done by Monting Engineering, Bitola, Republic of North Macedonia within the agreed period of 150 days.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.