Abstract

The Danish Cancer Centre by architects Gehry Partners has presented the engineering team with a number of challenges. This paper describes primarily the challenges posed by the use of 450 × 450 mm solid Douglas Fyr members for a Mikado-like beam and column system, and the preservation of the existing historic building from 1908. These included developing a robust structural concept that allows the wooden members freedom to twist and crack over time. The paper also provides insight into the extensive fire and building services engineering carried out. The use of BIM, in particular Revit Structure, for the fabrication drawings of more than 500 steel/wood connections, is also described.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.