Abstract
A new bridge deck system developed a few years ago using Precast Deck Panels with Ultra High Performance Concrete (UHPC) joints has been gaining popularity. This new deck system utilizes the superior characteristics of UHPC to simplify the precast panel fabrication and installation processes as opposed to the conventional approach such as internal post-tensioning. This paper presents the application of this new deck system to a recent $450 million Circle Interchange Project in Chicago.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.