Abstract
A new concept of prefabricated-piled-pier techniques is introduced into the design of an emergency container wharf in the reconstruction of the port of Kobe.Damaged caisson type quay walls are used as earth retainings and steel pipe piles are driven in front of them . Precast concrete procedures for upper concrete.works are employed to shorten construction time.A precast floor slab with uniform thickness is applied instead of an ordinary beam and floor slab.PC hollow beams are used to connect the gap between them.These concrete members are installed by a large floating crane.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.