Abstract

The Basalt Waste Isolation Project developed a large-scale block test to investigate the in-situ deformational response of a basalt rock mass. The test was designed and installed into the vertical rib (wall) of a tunnel to examine the response of basalt both in a parallel and perpendicular mode to the basalt columns. The salient challenge confronting the design and development of the test was a lack of documented experience for testing into a vertical wall. Information was available for testing in a horizontal surface. The major tasks involved in the implementation of this test included flat-jack slot drilling, instrumentation hole drilling, cable anchor hole drilling, flat-jack installation, monitoring instrumentation installation, and cable anchor installation. Drilling in the closely jointed and fractured rock mass required extreme care to prevent unraveling of the columnar structure and to minimize the disturbance of the section to be tested. The adaptation of a high-strength cable anchor system to the space limitations of the test configuration and the design and implementation of an optical deformation monitoring device capable of achieving a measurement precision of 30 ..mu..m required equal innovation. Construction of the test facility was successfully completed on schedule in approx. 25 wk.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call