Abstract
The NBI-2 system for the KSTAR has been designed to provide plasma heating and current for maximum 300 s which has the capability of 6 MW of deuterium neutral beam power. The NBI-2 system is under construction on site to be operated for the beam injection into the KSTAR plasma from the 2018 KSTAR campaign. The ion dump modules consist of the full, half, and third energy components is positioned on one side of the bending magnet. The ion dump of KSTAR NBI-2 system is designed with a hypervapotron-typed channel to withstand a heat flux of about 6.7 MW/m2 that was calculated by the beam transfer code simulation. The water flow rate supplied to each hypervapotron channel of the ion dump is about 1.9 kg/s at inlet. The inner size of the hypervapotron channel is modified to reduce a pressure drop and a liquid velocity difference in the channel.The CFD analysis using Ansys CFX is performed to verify its availability in the high heat flux condition. There is no problem to use the ion dump of the KSTAR NBI-2 system because the maximum temperature of the ion dump body made of CuCrZr is about 428.4 °C which is below allowable temperature of 500 °C.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.