Abstract

The general purpose of making an ATP (Acceptance Test Procedure) report is to test whether the system that has been worked on is in accordance with the function specifications (validation). The ATP report used by an agency is infrastructure, equipment installation, etc. The manufacture of ATP for BTS installation on telecommunication subcons is manual which can reduce a lot of work time and data discrepancies. Therefore, a web-based ATP report system was designed to be able to perform reports with proper coordinate validation prior to installation and can also save work time. The web-based ATP report can match the important points of BTS installation. System planning starts from data collection and analysis to be used as a web-based report. Data transmission will be accommodated on the server and will be stored in the data base using My SQL. After the design is complete, it can be seen that with the analysis stage of the system design and system design using Data Flow Diagrams (DFD), input output design, responses from each each user with the function of each form content. for user engineers there are 97.2% agree from some menu functions, for user documentation there are 97.5% agree with the system, for user owners there are 91.65% agree and also QoS (Quality Of Service) testing is carried out for several cellular operators namely Im3 ooredoo , XL, Telkomsel and also the Polynema wifi network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.