Abstract

A four-vane continuous wave (CW) RFQ has been designed for the injector II LINAC of China ADS project. To acquire the experience of a CW RFQ on design, tuning, conditioning, running, etc., a 1-m-long RFQ accelerator prototype has been built. Working at 162.5MHz, the RFQ prototype accelerates protons of 10mA from 20keV to 560keV in one meter length with a low inter-vane voltage of 65kV and a safe Kilpatric factor of 1.3. Conditioning and beam test of the accelerator prototype have been completed, and it shows the transmission efficiency can reach 90% with a 10mA CW proton beam. Design, fabrication and tests of the RFQ prototype will be presented in detail in the paper.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call