Abstract
In this paper, we focus on the schedulings of 2-steps graph with constant task cost obtained when parallelizing algorithm solving a triangular linear system. We present three scheduling approaches having the same least theoretical execution time. The first is designed through solving a 0-1 integer problem by Mixed Integer Programming (MIP), the second is based on the Critical Path Algorithm (CPA) and the third is a particular Column-Oriented Scheduling (COS). The MIP approach experiments were carried out and confirmed that the makespan values of the MIP scheduling coincide with those of the corresponding lower bound already reached. Experimental results of the last two approaches detailing both makespans and efficiencies are presented and show that their practical performances differ though they are theoretically identical. We compare also these results to those of the appropriate procedure into so-called PLASMA library (Parallel Linear Algebra for Scalable Multi-core Architectures).
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.