Abstract

This paper aims to study the design process and service performance of a deep excavation supported by tieback anchored pile walls. The design procedure and design approaches for deep excavation in China are described. Based on the excavation case history for Shenyang, China, design results obtained using the elastic method and the finite element method (FEM) are compared and analyzed. Special emphasis is given to the analysis of horizontal wall deformations, internal forces in the wall, earth pressures on the wall, ground surface settlements, and stabilities of the excavation. The similarities and differences between the Chinese code (JGJ 120-2012) and the European code (EN 1997-1) for the design of geotechnical structures are presented based on a design example. Through the comparison, it is indicated that the Chinese code focuses on the design result, while the European code focuses on the design process. The crucial construction methods for reducing construction risk based on the excavation case history are described. The mechanical behaviors of the excavation retained by an anchored pile wall were investigated by analyzing observed field cases. The results provide good, practical guidelines for the design and construction of a tieback anchored pile wall retained excavation in sandy soil.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.