Abstract
The traditional strategy in garment businesses is confronting a considerable measure of issues, for example, longer Production lead time, high work, supply sought after, high texture waste, longer production time and ailing in the utilization of assets. ABC clothing company is experiencing the previously mentioned issues. Enhancing efficiency through quantitative research strategies and distinctive lean assembling devices, for example, the institutionalization of the work process, line adjusting, and 5S were utilized to distinguish the issues and to address the arrangements. By understanding the real issue, the use of these lean assembling devices and their advantages were inspected. Earlier it was around 210 items for each day once in the day of actualizing the lean tools it was around 280 every day. The efficiency has increased by 25%. In like manner, the adjusting balancing loss was decreased by 35%. The implication of this investigation can give the entire practical answer to the usage of lean tools, minimization of waste and viable use of the asset in a piece of the garment industry for enhancing efficiency.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.