Abstract

Stakeholder participation is viewed as a key element of ecosystem-based marine spatial planning (MSP). There is much debate over the effectiveness of stakeholder participation in ecosystem-based management (EBM) in general and over the form it should take. Particular challenges relating to participation in the marine environment are highlighted. A study of the Eastern Scotian Shelf Integrated Management initiative, which uses a collaborative planning model to implement EBM, is presented in order to explore these issues further. Criteria derived from a review of collaborative planning literature are employed to evaluate the effectiveness of this model, which is found to be a useful consensus-building tool. Although a strategic-level plan has been adopted, the initiative has encountered difficulties transitioning from plan development to plan implementation. These are attributable in large measure to deficiencies in the design of the collaborative model. Useful lessons relating mainly to stakeholder engagement, the role of the lead agency, and implementation strategies are advanced for those engaging in MSP processes.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.