Abstract
AbstractUnderstanding the impact forces exerted by debris flows is limited by a lack of direct field measurements and validated numerical models. In this study, we use real‐time impact‐force measurements and field observations of debris flows recorded by a sensor network in Jiangjia Ravine, China, to quantify the impact‐force distribution of natural debris flows. We observed one debris flow event during and after a storm on 25 August 2004, including 42 short‐duration surges and seven long‐duration surges, and impact‐force signals were successfully recorded for 38 surges. Our observed debris flows comprise high‐viscosity laminar flows with high sediment concentration and frequent solid‐to‐solid interactions. We identified a large magnitude (up to 1 kN), high‐frequency (greater than 1 Hz) fluctuating component of the impact force that we interpret as solid particle impact on the sensors. The variability of particle impact forces increases with the mean impact force. Our results show that a log‐logistic distribution can describe the probability density distribution of impact forces. Solid‐dominated surges and fluid‐dominated intersurge flows have similar impact‐force distributions, but surges usually have heavy tails. We created a dimensionless number to describe the impact force and correlated it against existing dimensionless parameters. Finally, we develop a simple particle impact model to understand the relationship between flow dynamics and the impact force inside debris flows that could be applied to improve debris‐flow flume experiments and design debris‐flow hazard mitigation measures.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.