Abstract

Deployment of a large parallel system typically involves several steps of preparation, delivery, installation, testing and acceptance, making such deployments a very complex process. Despite the availability of various petascale systems currently, the steps and lessons from their deployment are rarely described in the literature. This article documents our experiences from the deployment of the sustained petascale Blue Waters system at NCSA. Our presentation is focused on the final deployment steps, where the system was intensively tested and accepted by NCSA. Those experiences and lessons should be useful to guide similarly complex deployments of large systems in the future.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.