Abstract

The study aimed at evaluating the nitrogen removal performance of the immobilized denitrification filler, and the influence of shock loading on the high-rate denitrification process. A pilot scale reactor was operated for treatment of aniline production wastewater. The nitrogen removal activity significantly increased in the continuous feed experiments, reaching 5.23 kg N m−3 day−1 on day 31 (30 °C) at Hydraulic Retention Time (HRT) = 10 h. In the impact experiment, the denitrification filler was inhibited by Free Nitrite Acid (FNA) when the shock load flowed 1.5 times into the bioreactor and recovered after the load was restored for 20 h. The high-throughput results demonstrated that the dominant position of the denitrifying bacteria further enhanced in a micro toxic and high-salinity environment, providing a basis for the dominance of the composite denitrifying bacteria and the efficacy of the immobilization technology.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call