Abstract
AbstractMacLeamy’s time–effort distribution curves are among the most oft-cited sources for researchers interested in mainstreaming building information modeling (BIM) implementation in the architecture, engineering, and construction (AEC) industry. Succinctly, the curves offer a clever answer to the question: How can BIM benefit AEC processes? However, despite their significant theoretical and practical value, little previous research has been conducted to elaborate the time–effort distribution curves of any real-life projects. This research aims to demystify the time–effort distribution curves through comparison of a representative BIM project and a non-BIM project. Applying a set of innovative approaches, the actual time–effort distribution curves of two public housing construction projects in Hong Kong are produced and analyzed in-depth. The curves vividly show that BIM implementation increases the effort spent at design stage—that is, throughout the architecture and engineering processes—but the extr...
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.