Abstract

The installed capacity of photovoltaic (PV) systems has been increasing in Japan. When the capacity of PV systems is increased, electricity production may exceed the demand and surplus electricity from the PV systems may become a problem in the power system. To manage the surplus electricity, the PV output may have to be reduced during the light load period. In this paper, PV output reduction methods using a battery energy storage system (BESS), which is located on both the power system side and customer side, and customer equipment are proposed. The proposed methods including both centralized control method and local control method are demonstrated by field tests at the Miyako Island field test facility.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.