Abstract
This paper documents the use of the 4 x 8 in. plastic mold (PM) device on two full-depth reclamation (FDR) field projects where cement-stabilized material containing large aggregates were used. PM device specimens were assessed to understand project variability as well as investigate potential in-field curing protocols for early-age roadway trafficability. Additionally, PM device specimens were compared with cores to quantify early-age mechanical properties and relationships. The density of PM device specimens and cores were, on average, within 2% of one another. In some cases, on-site curing protocols produced strengths that were not statistically different from cores. Ultimately, the PM device was successfully implemented and capable of producing reliable and repeatable results that captured project variability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Transportation Research Record: Journal of the Transportation Research Board
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.