Abstract

Abstract Current Japanese oems utilize both make-to-stock (mts) and make-to-order (mto) to cope with demand fluctuation. In this article, we study how leading manufacturing firms utilize mts and mto by observing two case studies, Toyota’s and Omron’s operations in China. Production and delivery of component suppliers are based on the advance notification from their manufacturers. For this, most automotive firms integrate marketing channels internally, however, most healthcare firms do not. Consequently, it is difficult to forecast and control demand accurately like automotive firms. In this sense, for healthcare firms, it is a tremendous challenge to respond to demand fluctuation through integration with external marketing agencies. We show both companies strategies to mix mts and mto along with integrating internal and external parties.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.