Abstract

A production management system contains many imprecise natures. The conventional deterministic and/or stochastic model in a computer integrated production management system (CIPMS) may not capture the imprecise natures well. This study examines how the imprecise natures in the CIPMS affect the planning results. Possibilistic linear programming models are also proposed for the aggregate production planning problem with imprecise natures. The proposed model can adequately describe the imprecise natures in a production system and, in doing so, the CIPMS can adapt to a variety of non-crisp properties in an actual system. For comparison, the classic aggregate production planning problem given by Holt, Modigliani, and Simon (HMS) is solved using the proposed possibilistic model and the crisp model of Hanssmann and Hess (HH). Perturbing the cost coefficients and the demand allows one to simulate the imprecise natures of a real world and evaluate the effect of the imprecise natures to production plans by both the possibilistic and the crisp HH approaches. Experimental results indicate that the possibilistic model does provide better plans that can tolerate a higher spectrum of imprecise properties than those obtained by the crisp HH model.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.