Abstract
For validating the safety of the new design of large passive nuclear plant, a series of thermal-hydraulic(T-H) test facilities were set up by SNPTRD. The T-H performance of passive containment cooling system was deeply researched by the sub-scaled modeling integral test system – CERT, according to scaling-analysis method. Besides of traditional T-H methods, we had tried applying ANN to simulate the performance of CERT, which is a multi-parameters system. The ANN is adapted from a Feed-Forward Back-Propagation network with delayed output feed-back. Two different networks were set up for the steady-state and transient case respectively. A directly Monte Carlo(M.C.) selecting procedure was generated to achieve a set of optimized weights of the networks. After the circulatory calculation of ANN combined with M.C., 9311 samples were calculated for a specific steady-state case. The minimum value for the largest bias is 2.4%. For transient case, two tests of different steam-injection conditions were studied. After 1e5 samples, the maximum bias for simulating two transient cases can be limited at 10.7%, and 17.9% respectively.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.