Abstract

PurposeThe purpose of this paper is to report the results of a survey undertaken to identify and rank factors that are responsible for delay in the schedule of strategic industrial projects in Iran.Design/methodology/approachThe survey covered 40 factors identified by previous literature and modified by 20 project professionals to fit the Iranian industrial culture. These factors were grouped into six major categories. For each category, the Shannon entropy weighting technique was applied.FindingsThe analysis of the 64 returned out of 87 randomly distributed questionnaires revealed that “sanctions” from political group, “cash flow problems” from financial group, “equipment availability and failure” from technical group, “project manager competence” from managerial group, “material procurement” from procurement group and “unqualified workforce” from human resource group were ranked as the highest contributing factors.Originality/valueThe findings of this study are of practical use for project professionals and experts seeking to improve the schedule performance of industrial projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.