Abstract
Conveyor belts serve as the primary mode of ore transportation in mineral processing plants. Feeders, comprised of shorter conveyors, regulate the material flow from silos to longer conveyor belts by adjusting their velocity. This velocity manipulation is facilitated by automatic controllers that gauge the material weight on the conveyor using scales. However, due to positioning constraints of these scales, a notable delay ensues between measurement and the adjustment of the feeder speed. This dead time poses a significant challenge in control design, aiming to prevent oscillations in material levels on the conveyor belt. This paper contributes in two key areas: firstly, through a simulation-based comparison of various control techniques addressing this issue across diverse scenarios; secondly, by implementing the Smith predictor solution in an operational plant and contrasting its performance with that of a single PID controller. Evaluation spans both the transient flow rate during step change setpoints and a month-long assessment. The experimental results reveal a notable increase in production by 355 t/h and a substantial reduction in flow rate oscillations on the conveyor belt, evidenced by a 55% decrease in the standard deviation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.