Abstract

On the basis of Iran's strategic development plan, natural gas industry must develop the capacity of gas transmission up to 1300millionm3 per day until 2025. For this purpose, gas pipeline length should be doubled during the next 15years; however, experience shows a remarkable delay in nearly all gas pipeline projects. The main goal of this paper is to identify and rank the causes of delay in these kinds of projects in Iran. In this regard, 24 executed gas pipeline projects were studied and then extracted delay factors were conferred with 10 experts from several disciplines. The result was a 43-item list of factors which then was ranked by means of a questionnaire survey. The result reveals that the 10 major delay factors are: “imported materials, unrealistic project duration, client-related materials, land expropriation, change orders, contractor selection methods, payment to contractor, obtaining permits, suppliers, and contractor's cash flow”.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.