Abstract
Underground communication system can be organized as a delay tolerant network (DTN), where delay analysis is of importance. In this paper, we derive the analysis method of block delivery delay in underground DTN using network coding. Unlike existing works that only use the contact-based model, we adopt the random walk on 2-D grid model as our mobility model. We define the innovativeness of a node as the number of new packet it can bring to the destination and derive the network state dynamics based on this definition. The simulations show that our analytic approach has better prediction to the delay performance.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Advanced Materials Research
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.