Abstract
Delay analysis for superconductive Single Flux Quantum (SFQ) logic is performed for Self-Timing-Aligned Clock Synchronization Technique (STAC). With its pipelined-structure, the SFQ generates and propagates pulses that are to be processed sequentially through serial-connected functional logic blocks, and thus it is critical to acquire a ultra-high-speed and exactly synchronized clock/control signals with a few pico-second resolution. Both passive and Josephson-Junction circuits are investigated for the delay control. These delays, being connected in parallel with input line, and to the clocked-power/control node, produce a self-timing-aligned synchronization. Ways to achieve precision delays are seek by using Mo resistors along with junction inherent capacitors. Both current margins for the bias and critical timing information for the maximum throughput are also investigated. Layouts for the test SFQ circuits, such as D- and RS-flip-flops are done with XIC, and verifications are done through WRSpice with Hypres process parameters.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.