Abstract
The wireless private network system in 230 MHz band is gradually applied to the power industry. However, a wide range of services is carried by the power wireless private network, and the network requirements are totally different. Thus, the adaptation of private network to existing services and new services is not clear, which leads to low utilization of communication resources. In this paper, the main services and network requirements of the power wireless private network are analyzed, and the system index of the power wireless private network is proposed. The theoretical analysis of the system delay is carried out, and the system delay values under different configuration conditions are obtained. Finally, combined with the current network test results of the State Grid Corporation of China, the analysis results of different power wireless private network system delay in 230 MHz band are given.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.