Abstract
The present work is to evaluate energy consumption in wireless sensor networks for multi-layer medium access control (ML-MAC) scheme where the delay times, i.e., packet transmission delay, maximum response time delay, clock-drift delay, sleep delay and queuing delay are considered. Sensor nodes in ML-MAC algorithm have very short listening time than sensor-MAC (S-MAC) which would minimize the energy. The number of collisions where two or more nodes try to send at the same time is reduced in ML-MAC. Simulation results of performance of ML-MAC compared with ML-MAC considering the delay time and S-MAC.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.