Abstract

Multi-link Operation (MLO), arguably the most disruptive feature introduced in IEEE 802.11be, will cater for delay-sensitive applications by using multiple radio interfaces concurrently. In this paper, we analyze the delay distribution of MLO under non-saturated traffic. Our results show that upgrading from legacy single-link to MLO successfully contains the $95$th percentile delay as the traffic load increases, but also that adding extra interfaces yields rapidly diminishing gains. Further experiments we conduct on Google Stadia traces, accounting for realistic traffic with batch arrivals, confirm the insights stemming from our theoretical analysis, vouching for MLO to support high-resolution real-time video with a controlled delay.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.