Abstract

We examine the delay performance of packets from constant-bit-rate (CBR) traffic whose delay is affected by non-real-time traffic. The delay performance is analyzed by solving the nD/D/1 queue with vacations. We obtain an exact and closed form solution, hence obviating the need of any approximations or numerical Laplace inversions. We then provide various numerical results for low-bit-rate transmission links, in which packets can experience large delay. From our quantitative evaluation, we conclude that there exists an optimum packet size for a given delay bound. In extremely slow links, such as modem links, transmission control protocol (TCP) packets should be segmented to reduce the CBR delay. We therefore investigate the delay impact of TCP packet sizes as well.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.