Abstract

A description of the discovery of the delamination of the 3‐ft (76‐m) thick concrete dome portion of a nuclear power plant containment. An investigation was made as to the causes of the delamination, the strength of the delaminated structure, and repair techniques. Repairs were made consisting of epoxy injection of cracks in the lower 2 ft (51 m) of the dome, providing radial anchors between the lower portion of the dome and the upper “cap,” the delaminated portion, which was removed and replaced with new concrete.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.