Abstract

The energy pile can support the load of upper buildings and exploit the shallow geothermal energy by embedding the traditional ground-source heat pump in the pile foundation of buildings. The steel roof has a large span and poor load-bearing capacity, and it is easy to collapse in the ice and snow weather. Based on the model test and the numerical model, the differences of deicing efficiency on roof through heat exchange pipe under different heat exchange pipe materials, position of pipe layout and pipe spacing on the roof panel, etc. were analyzed in this paper, Results showed that, when the heat exchange pipes were arranged above the panel, the ice melting time was about 2 / 3 of that when heat exchange pipes were arranged under the panel; The shorter the pipe spacing and the denser the pipe arrangement, the faster the ice melting rate.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.