Abstract

The vehicle development process (VDP) is iterative in nature with numerous interactions and information flows between design groups and between development phases. The VDP has been changed from a sequential‐functional development to a concurrent‐team based approach. Concurrent execution of design activities may reduce the development lead‐time, but it increases the managerial complexity in the VDP. A system dynamics model was developed to understand the transient behavior of parallel, overlap, and sequential processes in the VDP and to determine the optimal level of overlapping considering the development lead‐time and total number of reworks. The simulation results showed that different execution processes should be used, depending upon the intensity of reworks.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.