Abstract

This paper presents an analysis of observations of the displacement of the rock mass at the site of the underground machine hall of the Rogun hydropower plant during its completion. The main features of the displacement of the rock mass are considered and the advantages of using multipoint extensometers to observe the state of the rock mass are noted.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.