Abstract
The Qinghai-Tibet railway, the highest railway in terms of elevation, was built under the harshest of weather conditions in the world. A new technique, called the ventiduct embankment, was used for the first time in railway construction in the Qinghai-Tibet permafrost region of China to overcome the specific difficulties of the permafrost plateau. To evaluate its effectiveness, several full-scale test embankments were constructed at a representative field site, the Qingshuihe experimental section. The effectiveness of the ventiduct embankment structure has been verified by comparing it with the performance of the nearby control embankment in terms of permafrost table, settlement, and thaw depth. These observations are presented in this paper. The ventiduct embankment structure based on this study has been adopted in Qinghai-Tibet permafrost railway construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.