Abstract

This paper investigates the behavior of a 15-m high multi-anchored bored pile wall built in a dune sand overlying a naturally occurring lateritic soil layer. A parametric study using the finite element method was carried out to model wall deflections and ground movements during construction phases. Deflection results from the numerical simulations were compared to data collected in the field. The maximum horizontal wall deflection shows a non-linear decreasing trend with increasing system stiffness. Embedment length was found to play a secondary role on wall deflections. Predicted horizontal wall deflections after preloading of second and third anchor layers were on average 30% smaller than the corresponding field values.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.