Abstract

Good Supply Chain Visibility (SCV) is vital for on-time delivery and installation of materials on industrial construction projects. SCV is possible via the exchange of information about materials in the supply chain. Prior academic research has highlighted the importance of SCV. However, the literature lacks the detailed definition of visibility that can be easily applied to projects. This research reviewed prior studies on SCV and adopted an appropriate definition that supports relevant decision-making on industrial construction projects. From this definition, the research objective is to develop detailed operational definitions of information needed to support supply chain decisions on industrial construction projects. The study employed mixed methods that consisted of interviews, review of mini-cases of industrial projects, procurement and material tracking tool assessment, and group discussions in structured workshops with a panel of subject matter experts. The research developed 79 detailed information needs and associated definitions that support ten key supply chain decision areas across detailed design, procurement, and construction phases of industrial construction projects. These definitions were evaluated by multiple means including an external team and a case study of an industrial construction project. The definitions developed by this research will enable both researchers and practitioners to invest in better measurements of visibility and support development of new tools and techniques.

Highlights

  • Chain visibility (SCV) refers to making informed decisions using the timely and accurate exchange of information between the participants as the materials move in the supply chain (Francis, 2008; Goh et al, 2009)

  • The current paper focuses on defining supply chain visibility (SCV) in detail for the industrial construction projects

  • Having visibility into the supply chain can result in more effective management and improved project performance

Read more

Summary

Introduction

Chain visibility (SCV) refers to making informed decisions using the timely and accurate exchange of information between the participants as the materials move in the supply chain (Francis, 2008; Goh et al, 2009). The SCV of materials in industrial construction projects is reported to be low (Dharmapalan and O’Brien, 2018). These projects involve multiple supply chain participants who participate in varying

Objectives
Methods
Discussion
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.