Abstract

In warship design and development, reliability should be allocated from top-level requirements to subsystem and equipment levels using an effective allocation method. Mission reliability and inherent availability are top-level reliability parameters of a warship; these parameters do not only involve factors of reliability, but also those of maintainability. Therefore, extensively used reliability allocation methods cannot address the reliability allocation of warships. A warship is a typical repairable system. Based on warship characteristics, this study proposed an integrated reliability and maintainability allocation method for warships. In the comprehensive allocation process, reliability and maintainability factors that affect the top-level reliability parameters of a warship were measured quantitatively. The synergistic principle of the reliability and maintainability indexes was discussed to solve the synergistic problem between the reliability and maintainability parameters of a unit. The top-level reliability indexes of a warship were reasonably allocated to all levels using optimisation methods. The proposed method is not only suitable for warship reliability allocation but also for other complex repairable systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.