Abstract

Construction of deepwater pile foundation is difficult and complex. By the example of Xiaoyi reservoir bridge, this paper introduces the construction scheme of the pier in the water, which is building temporary bridge and drilling platform. Field-operation platform and steel sheet pile cofferdam. Engineering practice proves that this construction scheme can speed up construction schedule, and can ensure the quality of construction, which offers mirrors and references for similar engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.