Abstract

Key Points We characterize key deep uncertainties surrounding flood risk projections for a levee ring in New Orleans using 18 probabilistic scenarios The levee system alone may provide flood protection between the 100‐ and 500‐year return period Uncertainty in the storm surge distribution shape parameter is the primary driver of flood risk variability

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.