Abstract

This paper describes the design and use of deep bench marks by the Division of Building Research of the National Research Council of Canada. The bench marks consist of an inner pipe protected by an outer casing from the effects of seasonal ground movements and frost action. In sensitive clays the bench mark is installed by jacking or driving the outer casing with relatively simple equipment. In stiffer clays it is inserted in an augered hole and then turned and pushed to refusal with a drill rig. In permafrost areas, the bench mark is placed in a drilled or steamed hole to a depth at which the lower portion of the inner rod is securely anchored in the perennially frozen ground. Details of bench mark assemblies and installation techniques for soft clays, stiff clays, and frozen ground are described.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.