Abstract
For advanced, non-destructive on-site condition monitoring of HV power cables up to 150kV by partial discharge detection and dielectric losses measurement it is necessary to energize the disconnected cable system. One of the methods available for this purpose is based on applying damped AC voltages up to 150kV. In this paper, the use of modern technological solutions in power electronics and signal processing as well as in technical design and production methods will be discussed on the basis of the ultra light system (300kg) which is able to test cables up to 20km lengths.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Emerging Electric Power Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.