Abstract

Large interconnected power systems are decomposed into areas or zones based on the size of the electric power system, network topology and geographical location. Multi-area economic emission dispatch (MAEED) problem is an optimisation task in power system operation for allocating amount of generation to the committed units within these areas. Its objective is to minimise the fuel cost subject to the power balance, generators limits, transmission lines, and tie-line constraints. The solution of the MAEED problem in the conditions of deregulation is difficult, due to the model size, nonlinearity, and interconnections. It determines the amount of power that can be economically generated in the areas and transferred to other areas if it is needed without violating tie-line capacity constraints. High-performance computing (HPC) gives possibilities for reduction of the problem complexity and the time for calculation by the use of parallel processing for running advanced application programs efficiently, reliably and quickly.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call