Abstract

The objective of the UCLA Boelter Reactor Decommissioning Project was the release of the Boelter reactor facility for unrestricted use. The facility included a 100 kW Argonaut type research reactor that operated from 1963 to 1985, providing general reactor research. The decommissioning was planned as a two-phase program. Phase I involved removal of the reactor core structure for better access and assessment of the biological shield. Phase II decommissioning activities included structural steel removal, activated concrete removal, process equipment pit piping dismantlement, and clean concrete removal. The final release survey of the Boelter reactor facility demonstrated that all areas satisfied the project's release criteria. The total person-Sv for the project was 3.87 x 10(-2) (3.87 person-rem), most of which was received during the structural steel and activated concrete removal tasks and the disassembly of the reactor core.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.