Abstract

Risk-informed decision making is often accompanied by the specification of an acceptable level of risk. Such target level is compared against the value of a risk metric, usually computed through a probabilistic safety assessment model, to decide about the acceptability of a given design, the launch of a space mission, etc. Importance measures complement the decision process with information about the risk/safety significance of events. However, importance measures do not tell us whether the occurrence of an event can change the overarching decision. By linking value of information and importance measures for probabilistic risk assessment models, this work obtains a value-of-information-based importance measure that brings together the risk metric, risk importance measures, and the risk threshold in one expression. The new importance measure does not impose additional computational burden because it can be calculated from our knowledge of the risk achievement and risk reduction worth, and complements the insights delivered by these importance measures. Several properties are discussed, including the joint decision worth of basic event groups. The application to the large loss of coolant accident sequence of the Advanced Test Reactor helps us in illustrating the risk analysis insights.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.