Abstract

The growing interconnections of regional power systems and the large-scale integration of wind energy bring about the critical need to coordinate multiarea generation unit and tie-line scheduling (MAUTS). It is recognized that because of the limitations on private data exchange and model management, it is suitable to address the multiarea power scheduling problem in a decentralized way. In this paper, the MAUTS problem is formulated using the adaptive robust optimization (RO) scheme to account for uncertain wind energy. Our model is decomposed into regional subproblems by augmented Lagrangian decomposition (ALD), which enables a fully distributed computation within an alternating direction multiplier method framework. To address the nonconvexity issue, a tractable alternating optimization procedure (AOP) is developed to obtain high-quality solutions with finite convergence for the nonconvex mixed-integer problem. Simulations on different test systems are conducted to show the computational performance, the solution quality, and scalability of the proposed method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.